Size a cable and prove the voltage drop for a feeder in one pass. You enter the feeder once, and the application works out the current, applies the derating for how the cable is actually laid, checks the drop against your permissible limit, and gives you a figure you can put in a schedule and defend in a review.
The input screen is one page, laid out the way a feeder is actually specified, so there is nothing to hunt for. Everything on it is a value an engineer already has to hand when preparing a feeder schedule.
| Field | What it is for |
|---|---|
| Project name | Carried through to the printed output |
| Feeder number | Identifies the run in your schedule |
| From / To | Source panel and destination panel or equipment |
| Phase | Single phase or three phase |
| Connected load | In kW or kVA |
| Power factor | Used to convert load to current |
| Efficiency | For motor and similar loads |
| Voltage | 415 V, 11 kV or any other system voltage on the path |
| Cable material | Aluminium or copper |
| Cross section | Conductor size in sq.mm |
| Core | 1-core, 2-core, 3-core, 3.5-core or 4-core |
| Cable type | Armoured or unarmoured |
| Number of runs | Parallel cables sharing the load |
| Cable laid in | Ground, air or duct — this drives the derating |
| Derating factor | Applied on top, for grouping and ambient conditions |
| Length | Route length in metres |
| Permissible voltage drop | Your project limit, normally 3% |
| Standard | The cable data set the calculation reads from |
From the connected load, power factor, efficiency, system voltage and number of phases — so the current you size against is derived, not typed in by hand.
The cable's rated capacity reduced for the installation method and your derating factor, then compared against the design current.
Drop in volts and as a percentage over the route length, for the number of runs you specified, checked against your permissible limit.
The calculation reads from standard published cable data rather than one manufacturer's catalogue, so the result does not change when the supplier does. The data sets cover:
LT and HT feeders are both covered, up to 66 kV, so a single tool follows the path from the incoming HT run down to a final sub-circuit.
The point is not that the arithmetic is difficult. It is that doing it by spreadsheet for two hundred feeders invites one wrong cell, and nobody finds it until a reviewer does.
One licence key covers all four applications on one computer. Prices exclude GST.