Version 3.0

Voltage and Cable Sizer

Size a cable and prove the voltage drop for a feeder in one pass. You enter the feeder once, and the application works out the current, applies the derating for how the cable is actually laid, checks the drop against your permissible limit, and gives you a figure you can put in a schedule and defend in a review.

What you enter

The input screen is one page, laid out the way a feeder is actually specified, so there is nothing to hunt for. Everything on it is a value an engineer already has to hand when preparing a feeder schedule.

FieldWhat it is for
Project nameCarried through to the printed output
Feeder numberIdentifies the run in your schedule
From / ToSource panel and destination panel or equipment
PhaseSingle phase or three phase
Connected loadIn kW or kVA
Power factorUsed to convert load to current
EfficiencyFor motor and similar loads
Voltage415 V, 11 kV or any other system voltage on the path
Cable materialAluminium or copper
Cross sectionConductor size in sq.mm
Core1-core, 2-core, 3-core, 3.5-core or 4-core
Cable typeArmoured or unarmoured
Number of runsParallel cables sharing the load
Cable laid inGround, air or duct — this drives the derating
Derating factorApplied on top, for grouping and ambient conditions
LengthRoute length in metres
Permissible voltage dropYour project limit, normally 3%
StandardThe cable data set the calculation reads from

What it works out

Design current

From the connected load, power factor, efficiency, system voltage and number of phases — so the current you size against is derived, not typed in by hand.

Derated capacity

The cable's rated capacity reduced for the installation method and your derating factor, then compared against the design current.

Voltage drop

Drop in volts and as a percentage over the route length, for the number of runs you specified, checked against your permissible limit.

Cable data and standards

The calculation reads from standard published cable data rather than one manufacturer's catalogue, so the result does not change when the supplier does. The data sets cover:

LT and HT feeders are both covered, up to 66 kV, so a single tool follows the path from the incoming HT run down to a final sub-circuit.

What you get out

The point is not that the arithmetic is difficult. It is that doing it by spreadsheet for two hundred feeders invites one wrong cell, and nobody finds it until a reviewer does.

Use the Voltage and Cable Sizer on your next job

One licence key covers all four applications on one computer. Prices exclude GST.

← Back to all four applications